Milliman Building – 3rd Floor

AUTHOR:

admin

PUBLISHED:

September 29, 2020

CATEGORY:

Projects

Another one in the books!  Finishing a job for the 3rd floor of the Milliman building in Omaha, and it looks great!  The distinctive pattern of the Wilsonart Fawn Cypress laminate mixed with the rectangular oval matte black pulls looks fantastic.  The break room on this project is decked out with Wilsonart Solicor Designer White laminate, which eliminates the black line on any joints, and self-closing Rev-a-Shelf pull outs.  Overall a very satisfactory look!